EASTERN REFINERY LIMITED

AUTO TANK GAUGING (ATG) Systems

Recently, Automatic Tank Gauging System has been installed in ERL. In the first phase, ATG system has been installed in 20 Tanks (12 Fixed-roof & 8 Floating-roof tanks). In the second phase, the remaining 39 tanks will be equipped with ATG system. This system provides us:

  • Real-time inventory information.
  • Other real-time data, such as temperature, water level, volume, product movement information etc. for monitoring locally and remotely at Tank Farm Control Room (Tank-farm monitoring computer).
  • This real-time information can also be monitored from our process control room.

ATG System provides better solution in reducing human error in manual tank gauging and much safe and secure operation of crude and products.

Notices

eTender Notice Invitation: Supply of Horizontal Hydraulic (Hand Operated) Pipe Bending Machine. Last date 05-09-2018
Click here for Detail

International Tender Invitation: HYDRAULIC ROUGH TERRAIN CRANE, CENTRIFUGAL PUMP....Last sell date 25-09-2018.
Click here for Detail

বিভিন্ন ফাংশনাল এরিয়ায় কর্মকর্তা পদে নিয়োগ পরীক্ষার ফলাফল.(প্রকাশের তারিখ 09-08-2018).
Click here for Detail


Tender Invitation of Lawn Mower (Grass Cutting Machine). Last Sell Date 14-08-2018.
Click here for Detail

Recruitment Notice of Viva has been published(02-08-2018).
Click here for Detail


International Tender Invitation: AIR DRYER and ROCK WOOL WIRED INSULATION BLANKET.Last sell date 11-09-2018.
Click here for Detail

eTender Invitation: Supply of Spare parts for hydrometer and viscometer and Supply of Spare parts for distillation ASTM D86.
Click here for Detail

eTender Invitation of Supply Installation and Commissioning of Automatic Color Comparator Tinto-meter Glass cells ASTM Color filter and Saybolt Color filter.
Click here for Detail


International Tender Invitation of ON-LINE OXYGEN ANALYZER, SEAMLESS STEEL PIPE & ALLOY STEEL PIPE and CASTABLE REFRACTORY.
Click here for Detail

In regard to ERL purchase activities in e-tendering Please click here.


Laboratory Test Prices are updated
Click here for Detail

News & Events
1968-2018, 50 years ceremony of Eastern Refinery Limited has been celebrated on 07thMay, 2018 at International Convention Center.
40thAnnual General Meeting held on 02ndAug, 2017

Eid-e-Miladunnabi (SAW) has been observed at ERL on 19thJanuary, 2017

Contract Agreement signed between Bangladesh Petroleum Corporation (BPC) and Technip for the installation of ERL unit-2 on 18thJanuary, 2017
Click Here for Details

Contract Agreement signed between Bangladesh Petroleum Corporation and China Petroleum Pipeline Bureau for the installation of Single Point Mooring with Double Pipeline on 08thDecember, 2016
Click Here for Details

MOI signed between BPC and EIL for Project Management Consultancy for ERL Unit 2 on 19th April, 2016
Click Here For More Detail

Finished Products

Finished Products

ERL produces 16 petroleum products including a few non-fuel products, namely, SBP, JBO, MTT, BITUMEN. Some of these products are produced only on demand.

More
production

Physical Facilities

Refinery went on-stream with three Processing Units namely:
  Crude Distillation Unit,
  Catalytic Reforming Unit
  Hydrodesulphurization Unit

More
development

Development

procurement

Tender Information

    Local Tender:
  •  Goods: 00
  •  Works: 02
  • Foreign Tender:
  •  Goods: 00
  •  Works: 00
  • EOI:
  •  Consultancy Service: 00

More
Image 05

Lab Testing

ERL has an well Equipped Quality Control Lab for ensuring best quality products. It also provides outsider the facilities for the following test:

More