EASTERN REFINERY LIMITED

AUTO TANK GAUGING (ATG) Systems

Recently, Automatic Tank Gauging System has been installed in ERL. In the first phase, ATG system has been installed in 20 Tanks (12 Fixed-roof & 8 Floating-roof tanks). In the second phase, the remaining 39 tanks will be equipped with ATG system. This system provides us:

  • Real-time inventory information.
  • Other real-time data, such as temperature, water level, volume, product movement information etc. for monitoring locally and remotely at Tank Farm Control Room (Tank-farm monitoring computer).
  • This real-time information can also be monitored from our process control room.

ATG System provides better solution in reducing human error in manual tank gauging and much safe and secure operation of crude and products.

Notices

International Tender for supply and installation of complete Aerocondenser unit is available. Closing Date: 17-09-2017
Click here for Detail

National Tender for fork lift, air compressor, distribution panel and 10 KVA Online UPS is available. Closing Date: 25-07-2017
Click here for Detail

National Tender for Caustic Soda and Cloth Stitching is available. Closing Date: 30-07-2017
Click here for Detail

National Tender for Scrap Sale is available. Closing Date: 01-08-2017
Click here for Detail

International Tender for spare parts of compressor tools and varoius tools is available. Closing Date: 24-07-2017
Click here for Detail

Laboratory Test Prices are updated
Click here for Detail

News & Events
Eid-e-Miladunnabi (SAW) has been observed at ERL on 19thJanuary, 2017

Contract Agreement signed between Bangladesh Petroleum Corporation (BPC) and Technip for the installation of ERL unit-2 on 18thJanuary, 2017
Click Here for Details

Contract Agreement signed between Bangladesh Petroleum Corporation and China Petroleum Pipeline Bureau for the installation of Single Point Mooring with Double Pipeline on 08thDecember, 2016
Click Here for Details

MOI signed between BPC and EIL for Project Management Consultancy for ERL Unit 2 on 19th April, 2016
Click Here For More Detail

39th Annual General Meeting held on 06thMay, 2016
Finished Products

Finished Products

ERL produces 16 petroleum products including a few non-fuel products, namely, SBP, JBO, MTT, BITUMEN. Some of these products are produced only on demand.

More
production

Physical Facilities

Refinery went on-stream with three Processing Units namely:
  Crude Distillation Unit,
  Catalytic Reforming Unit
  Hydrodesulphurization Unit

More
development

Development

procurement

Tender Information

    Local Tender:
  •  Goods: 01
  •  Works: 00
  • Foreign Tender:
  •  Goods: 03
  •  Works: 01
  • EOI:
  •  Consultancy Service: 00

More
Image 05

Lab Testing

ERL has an well Equipped Quality Control Lab for ensuring best quality products. It also provides outsider the facilities for the following test:

More