EASTERN REFINERY LIMITED

PRODUCT QUALITY CONTROL

erl-qc

Quality Control Department

The basic activities of the Quality Control Department is to provide uninterrupted support for the quality products of ERL.

The Quality Control department is a modern self dependent laboratory for testing petroleum products in our country. With the help of modern apertures and skilled technicians, we are ready to take any kinds of challenge regarding quality Issue.

We follow test methods set by ASTM, UOP & IP.

We also provide technical support to others for operation of any kind of laboratory apparatus and testing of petroleum products.

For better output, there are nine different laboratories here at Q.C. These are Jet Petroleum Lab., General Lab., Bitumen Lab., Water analysis and Inorganic Lab., Special Lab-1, Special Lab-2, CFR Lab., Dark Room, Chromatograph Room.

Important apparatus of Q.C. department are:

CFR Engine, TBP Apparatus, Reduced Pressure Apparatus, Sulfur Apparatus (Lamp, High temperature method, Lab-X, Raney-Ni). Bomb-calorimeter, Rotatory Evaporator, Karl-Fischer Apparatus, Micro-separator etc.

Notices

International Tender for supply and installation of complete Aerocondenser unit is available. Closing Date: 17-09-2017
Click here for Detail

National Tender for fork lift, air compressor, distribution panel and 10 KVA Online UPS is available. Closing Date: 25-07-2017
Click here for Detail

National Tender for Caustic Soda and Cloth Stitching is available. Closing Date: 30-07-2017
Click here for Detail

National Tender for Scrap Sale is available. Closing Date: 01-08-2017
Click here for Detail

International Tender for spare parts of compressor tools and varoius tools is available. Closing Date: 24-07-2017
Click here for Detail

Laboratory Test Prices are updated
Click here for Detail

News & Events
Eid-e-Miladunnabi (SAW) has been observed at ERL on 19thJanuary, 2017

Contract Agreement signed between Bangladesh Petroleum Corporation (BPC) and Technip for the installation of ERL unit-2 on 18thJanuary, 2017
Click Here for Details

Contract Agreement signed between Bangladesh Petroleum Corporation and China Petroleum Pipeline Bureau for the installation of Single Point Mooring with Double Pipeline on 08thDecember, 2016
Click Here for Details

MOI signed between BPC and EIL for Project Management Consultancy for ERL Unit 2 on 19th April, 2016
Click Here For More Detail

39th Annual General Meeting held on 06thMay, 2016
Finished Products

Finished Products

ERL produces 16 petroleum products including a few non-fuel products, namely, SBP, JBO, MTT, BITUMEN. Some of these products are produced only on demand.

More
production

Physical Facilities

Refinery went on-stream with three Processing Units namely:
  Crude Distillation Unit,
  Catalytic Reforming Unit
  Hydrodesulphurization Unit

More
development

Development

procurement

Tender Information

    Local Tender:
  •  Goods: 01
  •  Works: 00
  • Foreign Tender:
  •  Goods: 03
  •  Works: 01
  • EOI:
  •  Consultancy Service: 00

More
Image 05

Lab Testing

ERL has an well Equipped Quality Control Lab for ensuring best quality products. It also provides outsider the facilities for the following test:

More