EASTERN REFINERY LIMITED

HEALTH & ENVIRONMENT

ERL Medical Centre

Environmental Programs

ERL has a strong commitment for maintaining clean, pollution free and healthy environment for its employees as well as the surrounding locations. It pursues the policy of good house-keeping and steady & safe operation of its various units and plants within design parameters.

Since long, ERL has discontinued the use of any toxic chemical for water treatment. It has proven incinerator system in operation for incinerating the obnoxious off-gases. All sorts of off-gases are released to atmosphere only in their final oxidized form.

ERL is also working on a program of monitoring hydrogen sulphide leakage. Use of Leaded chemicals (TEL TML) for augmenting octane rating of MS/HOBC has also been reduced from 1% to 0.5%. To its already existing well-designed oily water and rainy water separation system, ERL, of late, has put into operation, additional recovery systems similar to API separator system at the down-most end so that effluent water meets the safe limit of oil droplets carryover.

Notices

TENDER INVITATION NOTICE: DIFFERENT ROAD CONSTRUCTION /REPAIR OF ERL TANK FARM (RCC WORK 1) ON EXISTING HBB ROAD TO THE SOUTH OF TANK ‘A’-`B’-`C’ AND TO THE EAST OF TANK `C’-`D’ & 2) ON EXISTING SOIL ROAD TO THE SOUTH OF TANK T-44 &T-45). . LAST SELL DATE: 28-05-2019 12:00 BST
Click Here For Details

TENDER INVITATION NOTICE: SUPPLY, INSTALLATION AND COMMISSIONING OF INCOMING CIRCUIT BREAKER TYPE MASTER PACT M16N1. LAST SELL DATE: 27-05-2019 00:00 BST
Click Here For Details

TENDER INVITATION NOTICE: SUPPLY OF NEW MCC PANEL INCLUDING ALL EQUIPMENT FOR ABP UNIT AT ERL. LAST SELL DATE: 29-05-2019 12:00 BST
Click Here For Details

In regard to ERL purchase activities in e-tendering Please click here.

Laboratory Test Prices are updated
Click here for Detail

News & Events
1968-2018, 50 years ceremony of Eastern Refinery Limited has been celebrated on 07thMay, 2018 at International Convention Center.

42th Annual General Meeting will held up on 05thApril, 2019

Contract Agreement signed between Bangladesh Petroleum Corporation (BPC) and Technip for the installation of ERL unit-2 on 18thJanuary, 2017
Click Here for Details

Contract Agreement signed between Bangladesh Petroleum Corporation and China Petroleum Pipeline Bureau for the installation of Single Point Mooring with Double Pipeline on 08thDecember, 2016
Click Here for Details

MOI signed between BPC and EIL for Project Management Consultancy for ERL Unit 2 on 19th April, 2016
Click Here For More Detail

Finished Products

Finished Products

ERL produces 16 petroleum products including a few non-fuel products, namely, SBP, JBO, MTT, BITUMEN. Some of these products are produced only on demand.

More
production

Physical Facilities

Refinery went on-stream with three Processing Units namely:
  Crude Distillation Unit,
  Catalytic Reforming Unit
  Hydrodesulphurization Unit

More
development

Development

procurement

Tender Information

    Local Tender:
  •  Goods: 00
  •  Works: 02
  • Foreign Tender:
  •  Goods: 00
  •  Works: 00
  • EOI:
  •  Consultancy Service: 00

More
Image 05

Lab Testing

ERL has an well Equipped Quality Control Lab for ensuring best quality products. It also provides outsider the facilities for the following test:

More